Three real timelines
Ofena's website was rebuilt on Cloudflare in four days: started on 16 August 2026, live on the 20th, with its quote builder, admin area and every old address still working. That was fast because the brand, the content and the features already existed — it was a move, not a blank page.
Behaviour Shift, a brand-new events staffing agency, went from the first line of code to a website, a recruitment site with a six-step registration, an office for its applications, business cards and email signatures in 33 days. The recruitment site was live 22 days in, in time for the launch posts.
Ofena's original site grew over months: the brand first, then the website, then tools like a boiler size calculator. Projects built in stages take longer on the calendar, and that's often the right call.
What actually sets the pace
- Decisions. A design direction approved in three days keeps a project moving; one that waits three weeks stops it. Behaviour Shift's founder approved a direction three days after the build started.
- Content. Words and photographs are the most common hold-up. Start writing before the design is done, not after.
- Features. A brochure site is quick. Forms that save as you go, calculators, quotes and admin areas are software, and take software time.
- Integrations. Anything that connects to another system — bookings, a CRM, accounts — needs the other side to be ready too.
- Moving an existing site. Mapping and redirecting every old address takes care, but it protects your search rankings.
How to make it quicker
Name one person who can say yes. Have the content, or at least its outline, ready early. Separate what must be there on launch day from what can follow a week later — Behaviour Shift's office, email signatures and digital card all arrived after the recruitment site went live.
And watch the work as it's made. Our projects run on a private preview link, so small decisions get made the same day instead of saved up for a big review.
Plan back from the date that matters
If there's a launch, an event or a campaign, tell your studio first. A fixed date shapes the plan: what gets built first, what waits, and what's left out until after.